2013-07-31 - xxxx - Service Request - Investigation inconsistent STO Pur Reqs #ProductionBreakFix #STO #US #MRPPIR
2013-07-31 - 8358 - Service Request - Investigation inconsistent STO Pur Reqs
Problem Summary
Investigation inconsistent STO Pur Reqs
Admin Info
Purpose
|
Investigation inconsistent STO Pur Reqs
|
Requested by
|
Rahul Attarde
|
Issue Date
|
07-31-2013
|
Resolved by
|
Adithya
|
Resolved Date
|
08-02-2012
|
Document Status
|
Complete
|
Detailed Problem Description
(Include Screen Shots if required )
Investigation inconsistent STO Pur Reqs
1. STO Purchase requisitions were driving as demand to the supplying plant, though the STO's are deleted by MRP. Invalid STO are still showing as Demand
2. Investigation on PIR.
Solution Analysis and Recommendations
(Include Screen Shots if required)
1. Clearing invalid STO Purchase Requisitions
STO Purchase requisitions were driving as demand to the supplying plant, though the STO's are deleted by MRP. Invalid STO are still showing as Demand in /AFS/MD04 of supplying plant.
Eg: Material: 10683278 in plant 7410
For MID 10683278 in plant 7410, we see that there are few STO Purchase Requisitions which are driven as demand.
Which were actually deleted, but still is being shown up in /AFS/MD04, this is an inconsistency which can be corrected by PR correction report.
This occured due to change in special procurement status in the material master.
Few other Material List with the same issue : Attached are the list of materials identified and corrected.
8385_STO_PR_Mtls.xlsx
2. Investigation on PIR:
For Material 10965705 in plant 0117 if we look in /AFS/MD04 we see that PIR
1460164 is in Blocked B - Tab.
If we look in to /AFS/MD06 (last MRP run ‘’MRP LIST” which is carried at 07/31/2013 00:14 Hrs) we see that the same PIR is in T –Tab.
If we look in to T-Tab of /AFS/MD04, the same quantity which is assigned to PIR
1460164 is now assigned to safety stock demand.
Safety stock is been updated (same as PIR quantity) in the material master today:
Resolution
1. Corrective actions:
- MRP is carried out on the PIR and a proposal is generated.
- After MRP run, safety stock is been updated in the material master, which is creating the demand and the proposal which is generated against the PIR got assigned to safety stock moving PIR to B-Tab.
- In next MRP run a proposal shall be generated against the PIR.
2. Corrective actions :
- Carry out MRP run for the materials from the list attached (by giving Planning Mode : "3 - Delete and recreate planning data") in receiving plant.
- Run correction report for the invalid STO. Which can be seen in /AFS/MD04 of supplying plant.
- Carry out MRP run in supplying plant.
As per client request, corrected with the above steps and informed client.
Release Information
Provide link here to Release Notes if Technical Objects were changed